Each Compliance Pack includes –
Technical Specification – A document detailing all customer requirements for the job.
- Order confirmation – A copy of the final signed agreement between the customer and AFS
Position Drawings – A detailed view of the purchased products, including: system, fire rating, colour, sizes, area and total perimeter.
- Compliance Agreement – A signed agreement stating that the products will be installed compliantly using the correct fixings, into the correct openings and as per the installation guide.
Technical Guide – Test certificates and evidence to show that the products used are fully compliant and tested to the correct classification.
- Photographs – Photos taken throughout the end-to-end fabrication process to evidence that the fabrication was completed compliantly as per the manufacturers manuals.
- Invoices – A copy of material and glass invoices to evidence that all materials used on the project are traceable, compliant and tested.